法国艾菲尔铁塔项目
舍弗勒集团的维护和资产管理部门,FAG工业服务正致力于艾菲尔铁塔的滚动轴承和振动分析。该分析主要针对铁塔西部柱里的液压电梯车厢。这些圆锥滚子轴承可以负荷20吨。
EIFFEL TOWER WORK
The Schaeffler Group’s maintenance and asset management division, FAG Industrial Services, is working on the Eiffel Tower’s rolling bearings and vibration analysis for the elevator cabins of the hydraulic elevator in the tower’s western column. These tapered roller bearings support 20 metric tons.
