美国科罗拉多机场的自动扶梯更换工程

译文 Jade 2019-05-20

  据科罗拉多《哨兵日报》的报道,大章克申机场的两台自1982年就启用了的自动扶梯,即将作为整个航站楼更新工程的一部分,进行更换。与FCI Constructors, Inc. 公司的合同从5月15日起生效,将移除机场西边的下行自动扶梯并且安装一台新的。而按照计划,位于行李登记区的上行自动扶梯会在6月进行更换。根据FCI公司的说法,新的自动扶梯设备将由奥的斯电梯公司提供,也将是科罗拉多州北部仅有的两台。因此,根据信源,FCI公司将会从丹佛派来熟悉设备的技术人员进行处理。

  1982 ESCALATORS BEING REPLACED AT COLORADO AIRPORT

  Two escalators dating to 1982 are being replaced at the Grand Junction Regional Airport in Grand Junction, Colorado, as part of a larger terminal renovation, The Daily Sentinel reports. Contractors from FCI Constructors, Inc. worked throughout the day on May 15 to remove the “down” escalator on the west side of the airport and install a new one. The “up” escalator near the baggage check-in area is set to be replaced in June. According to FCI, the new equipment is being provided by Otis, the escalators are the only ones in western Colorado. For that reason, the source observes, FCI had to bring in technicians from Denver who are more familiar with the equipment.

下一篇: 全球十大电梯公司
上一篇: 墨尔本高层建筑设置专用电梯
相关文章
返回顶部小火箭