康力电梯经典工程展示-京沪高铁无锡东站

康力电梯 2015-06-22

康力电梯经典工程展示-京沪高铁无锡东站(图1) 

  工程名称:

  京沪高铁无锡东站

  项目背景:

  京沪高速铁路,全线纵贯北京、天津、上海三大直辖市和河北、山东、安徽、江苏四省,是新中国成立以来一次建设里程最长、投资最大、标准最高的高速铁路,也是国内第一条具有世界先进水平的高速铁路。

  京沪高铁无锡东站是京沪高铁在无锡的唯一停靠站点,该站点建成之后,将在无锡地区形成以京沪高铁无锡东站为中心,集多种交通形式于一体的高效综合交通枢纽。

  亮点:

  1、京沪高速铁路,是新中国成立以来一次建设里程最长、投资最大、标准最高的高速铁路。

  2、京沪高铁无锡东站将成为京沪高铁和无锡地铁、锡虞城际铁路的综合换乘站。

  电梯:

  康力为该项目提供自动扶梯21台,电梯23台。

  Project:

  Wuxi East Station on the Beijing-Shanghai High-Speed Railway

  Background:

  The Beijing-Shanghai High-Speed Railway, running through the 3 major municipalities of Beijing, Tianjin and Shanghai, also winding its way through Hebei, Shandong, Anhui and Jiangsu, is the the longest high-speed railway with the largest investment and the highest standard ever since the establishment of PRC. It’s also the first high-speed railway which reaches the highest world standard.

  Wuxi East Station is the only spot on this line in Wuxi. Its completion marks that centered on the very station, Wuxi is about to develop a transport hub with high efficiency and outstanding genenral conditions.

  Highlight:

  1、 The Beijing-Shanghai High-Speed Railway is the longest high-speed railway with the largest investment and the highest standard ever since the establishment of PRC.

  2、 Wuxi East Station is the comprehensive station for the high-speed railway, Wuxi Metro and intercity railroad between Wuxi and Shangyu.

  Elevator:

  Canny Elevator has provided 21 sets of escalators and 23 sets of elevators.

下一篇: 三菱电梯最新双模式技术应用于三星中国总部大厦
上一篇: 博林特:2015年第三次临时股东大会决议公告
相关文章
返回顶部小火箭